unfortunatly the standard gear would last long running fairly high boost so the engine is back at the workshop getting a set of VR4 Je forgies/
eagle rods, o-ring the block and the head with a copper head gasket, one balance shaft has the weights removed and the other was removed alltogether, a new copy of a hks cam shaft and hks adjustable wheel, mild porting of the head and the whole engine is being held together with ARP stud and bolt kit.
![Image](http://www.fr33z3.net/starions/130406_1825.jpg)
![Image](http://www.fr33z3.net/starions/130406_1826.jpg)
more pics coming soon.
the fuel system is slowly coming together. its going into and air tight box in the boot with an overboard vent.
![Image](http://www.fr33z3.net/starions/020406_2204.jpg)
the inlet manifold is finally finished. i had a coolant gallery put at the front and piped back to the thermostat housing, and speedflow nipples welded on for various applications
![Image](http://www.fr33z3.net/starions/090406_2055.jpg)